ITER - Technical Lots Installation (TB04)
To have a partner with nuclear expertise, and able to accompany it on this prototype (First-of-a-Kind) with exceptional characteristics (million °C temperatures, intense magnetic fields at 7 Tesla, etc...).
Services:
Fluid networks for TOKAMAK utilities (compressed air, breathing air, demineralized water, helium, nuclear or industrial drainage networks, etc.)
Design, qualification, implementation of caulking at our network crossings.
Key numbers
150 km
of networks 1000 tons
of support