ENEDIS x Equans
Station construction, installation and maintenance
Location: France
. Contract duration: 6 years
-
The issues
The issues
- Guarantee the availability of the network and the quality of the energy supplied;
- Guarantee the flexibility and scalability of HV substations. -
The solutions
The solutions
- Design and installation of 400 HV substations:
220 kV / 20 kV
90 kV / 20 kV
63 kV / 20 kV
- Production (computers and cabinets), factory acceptance, commissioning, installation, training, MCO.