Image
Salle anhydre

Anhydrous Room

Anhydrous Room

Image
Salle anhydre
Case Study
  • The Issues

    • Contribute to the construction of Europe’s first gigafactory, designed to produce lithium-ion batteries in sufficient quantities to meet the needs of the global electric vehicle market.

    • Improve the availability of these components, which are essential for clean mobility and will be in very high demand in the coming years.

    • Optimize production lead times and costs to compete with Asian manufacturers.

    • Reduce the environmental footprint and energy consumption of this gigafactory’s utilities, particularly its anhydrous rooms.

  • Our Solutions

    The design, supply, and installation of technological equipment for the creation of a lithium-ion battery production facility in Sweden includes:

    • Design and construction of a 48,000 m² anhydrous room (dew point -60) meeting ISO 6 standards

    • Storage and distribution of electrolyte

    • Management of utilities (heating water, ice, process water, compressed air)

    • A large back-office engineering team at our French sites

    • A team dedicated to this project is stationed on-site, working seamlessly with the client’s teams

    • A single point of contact to minimize interfaces

    • Ongoing value engineering: optimization of costs and timelines to meet the time-to-market requirements of this
    rapidly growing market

Our Solutions
Our Solutions
High technology

Battery Market

Image of Battery Market
Battery market

Electrolyte Storage

Image of Electrolyte Storage
Battery market

NMP Recycling

Image of NMP Recycling
Our News
Our News
Our News

ACC Reaffirms Its Confidence in Equans

Image
Image
Contact

Do you have a need? Let's talk about it!

Contact

Do you have a need? Let's talk about it!

Image