Engineering and detailed design of telecommunications networks for the rail industry: a team at your service!
Would you like to gain a clear understanding of your property’s condition before a project begins in order to optimize the work? Or would you like to ensure that the work performed complies with regulations and facilitate decision-making for future projects?Engineering and detailed design of telecommunications networks for the rail industry: a team at your service!
Would you like to gain a clear understanding of your property’s condition before a project begins in order to optimize the work? Or would you like to ensure that the work performed complies with regulations and facilitate decision-making for future projects?Image
Our 10 experts support you during the preliminary design and construction phases.
- During the preliminary design phase, we provide project management assistance (AVP, PRO, EXE, DCE Travaux). We perform utility line detection, stakeout, and 3D topographic surveying.
- During the construction phase, we prepare all documentation related to the work performed (final installation plan, completion of work, and as-built drawings) and serve as the contractor for specific work packages and oversee construction.
Key Figures
+ 14000
number of study hours completed per year 250 kms
STAKEOUT/Surveying: approximately 250 km of linear surveying in 2021 500 kms
Preparation of As-Built Drawings (PAT): Approximately 500 km of as-built verification in the design office Key Figures