A major challenge

The stakes are high : the aim is not only to modernize the production unit but also to offer a more sober and sustainable solution.

The result : better performance and less maintenance. But how to secure the production and distribution of utilities?

Facilitate maintenance? All this, in a "low carbon" perspective?

To answer this question, Equans France has turned to the design and construction of a turnkey building, bringing together the "Utilities":
- Thermal fluids (chilled water, hot water)
- Electrical power (transformer and main board)

Visuel_générique _Becton_Dickinson

A strategic lung

A real strategic "lung", this 300 m² building - adjacent to the manufacturing site - centralizes all the production of heat, cold and electricity in one place, then redistributes the energy produced.

The result of collaborative work with "cooling experts" and "electrical teams", this complex project brings into play the different know-how of Equans France, for the benefit of its customers.

Prior to the project, the teams carried out collaborative value engineering work to better understand the challenges and expectations of Becton Dickinson. If Henry Ford, the father of mass production, is to be believed, this "user-centric" approach optimizes production and performance, thanks to equipment tailored to the customer's needs and problems.

Redistribute the energy produced

For Becton Dickinson, for example, the multiplicity of units aggravated maintenance problems, without guaranteeing optimal performance. Hence the decision to group the various units together in a single location. This "energy hub" is the nerve center of the Isère site, with three 1.2 MW air-cooled chillers, two of which are magnetic bearings. "In addition to their acoustic performance and low-carbon approach, the quantum chillers are distinguished by their high energy performance. Another 1.3 MW water-fired GF quantum completes the set. "Sébastien Malugani, Equans France Sales Manager, emphasizes.

Below this high-tech installation, a 5.8 MW gas boiler room is connected to a 50-meter-long pipe rack. "These pipes are used to distribute thermal energy to the 50 air handling units on the site. It's as if we're touching on a critical aspect, because no temperature errors are allowed in this controlled environment."

becton_dickson
Sébastien Malugani, Sales Manager, Equans France
"The UPC is above all a contractual commitment based on a price and a schedule. Throughout the project, the client has a clear vision of the project, with no unpleasant surprises. It's a real gain in time, money and performance. "
Sébastien Malugani Sales Manager, Equans France

The Isère site continues its development and innovation strategy

With its new hub, the Isère site is pursuing its development and innovation strategy in the French medtech market. The group currently employs 70,000 people worldwide, in more than 190 countries, with sales in France of nearly €1,138 million in 2019.

Equans France does its utmost to guarantee plant performance, optimize building comfort and facilitate maintenance. This support allows Becton Dickinson to focus on its core business.