Cooling for Public Authorities and the Service Sector
To reduce your energy bill and your ecological footprint, EQUANS supports you in all your refrigeration and air conditioning with heat recovery projects, while guaranteeing sanitary security and user comfort.
Our Solutions & Services
An ecological refrigeration solution for each ice rink
EQUANS offers guidance in the design and creation of outdoor, temporary or indoor skating rinks, as well as in the conversion of existing rinks.
We design and maintain facilities in line with your needs:
- fewer CO2 emissions,
- sizing of distribution circuit,
- use of low carbon refrigerants,
- regulatory compliance,
- reduced energy consumption.
Reinjecting the heat produced to heat a swimming pool
Refrigeration for an ice rink construction or modernisation is a significant investment. Energy bills are soaring and authorities have no choice but to rethink their cooling and heating systems. With the Axima Réfrigération France offer, 100% of the heat produced can be reinjected to heat a swimming pool, a snow pit or other infrastructures, drastically reducing the energy bill.
Professional kitchens designed in accordance with health and safety standards
Our Qualicuisine and Qualiclimafroid qualifications and our certificates of competency in the handling of refrigerants are our guarantees of quality. They vouch for our experience and ability to guide you in a variety of fields: cooking, distribution, laundry, cooling, air conditioning, ventilation/extraction, etc.
Axima Réfrigération France : Combining air conditioning and comfort
With the Axima Réfrigération France offer, air conditioning systems are silent and intelligently incorporated to make them barely visible. As a result of our skills in design, execution and maintenance for the service sector and public authorities, we are in a position to offer solutions that combine comfort, air quality and controlled atmosphere for your buildings.
Some of our projects
High-efficiency reversible air conditioning
- Air conditioning: 7 VRV IV systems, 3 high-efficiency pipes and energy recovery.
- Ventilation: 7 intake and 2 extraction networks
- Plumbing-Sanitation: production of domestic hot water by electric boiler
- Optimum thermal comfort
- Air quality
- Scalable solution
Preventive and corrective maintenance on 69 ESID sites for 389 cold rooms and associated minor works
-
Average refrigeration power per cold room: 2.6 kW for a capacity of 14 m³
- 2 inspections per year
- Regulatory compliance
New bespoke self-service canteen and refrigerated cabinets with remote chiller unit
-
Installation of hood with extraction network and air compensation
- Supply and installation of ventilation duct networks
- Distribution of meals with hot plate
- 450 to 650 covers per day
- Maintenance of forward movement for food safety
- Fluidity of service with 2 distribution zones
“ The project’s objectives were to reduce the maintenance costs of the existing installation, optimise energy expenditure and lastly avoid faults and total breakdown of the rink. Feedback suggests that we are going to achieve these objectives, particularly in terms of water consumption, because we are approaching zero consumption, which was the initial objective. ”