système chauffage piscine
cuisine professionnelle
système climatisation sur toit
Vilanova (35)
chambre froide
ESID (57)
self service repas chauds
Etap’habitat (57)
The project’s objectives were to reduce the maintenance costs of the existing installation, optimise energy expenditure and lastly avoid faults and total breakdown of the rink. Feedback suggests that we are going to achieve these objectives, particularly in terms of water consumption, because we are approaching zero consumption, which was the initial objective.
Director of Operations Rennes (35)
Contact

Want to find more?