EDF x Equans
Involvement in the development of the third-generation nuclear reactor – Flamanville
Location: Flamanville (50)
Project years : 2008–2020
Contract duration: 12 years
-
The Issues
The Issues
As part of the construction of the Flamanville nuclear power plant, EDF is seeking a major, local, flexible, and competent contractor to:
• Build the first Generation III nuclear reactor;
• Invest in new generation capacity to ensure energy security;
• Ensure equipment availability and the long-term reliability of the facilities;
• Guarantee optimal power continuity at the site. -
Solutions
Solutions
• Design, handling, fabrication, and installation of piping systems and equipment;
• Ventilation and air conditioning for nuclear buildings (both clean and non-contaminated areas), the water pumping and treatment building, and the nuclear power plant construction site;
• Design of miscellaneous electrical installations (IED), qualification of safety-critical equipment, and supply and installation of all equipment in the conventional and nuclear islands:
✓ 400 km of cables, 250 km of safety cables (K1, K2, and K3 cables), 100 km of cable trays;
✓ 300 cabinets and racks, and 2,000 enclosures.