  • • Install a copper cable within the right-of-way near active railroad tracks
    • Dig a trench 25 km long near existing, active utility lines

  • • Excavation of trenches using excavators
    • Regular site inspections and provision of experienced excavator operators

  • • The integrity of the copper cable was maintained throughout the project (no defects were found during testing)
    • A high-quality final result, with the areas adjacent to the railroad tracks cleared to facilitate maintenance work

  • • Integration of employees undergoing vocational rehabilitation into the project
    • Management of waste generated through dedicated recycling channels