  • • Civil engineering work (installation of drainage channels and trenches)
    • Installation and connection of fiber-optic cables along 30 km of right-of-way

  • • Mechanization of tasks, notably through the use of a “gutter installer” tool designed in-house by our teams
    • Discovery of 4 World War II shells = engagement of a specialized contractor

  • • Schedule managed effectively, with a slight delay due to a 50% increase in the volume of work
    • High-quality final result (evaluation score: 18.5/20)

  • • Management of waste through dedicated recycling streams (5 different ones)
    • Integration of employees undergoing vocational rehabilitation into the project