ORANO x Ineo Nucléaire
Transition Engineering: Ineo Nucléaire draws on a wide range of expertise to support projects from design through implementation, with the goal of better controlling costs and risks.
Location: Tricastin Site
Duration: 2 years
The Issues
- Dismantle, at no cost, all electrical equipment and utilities related to the enrichment plants’ cooling system;
- Generate value through the sale of raw materials;
- Free up space for future decommissioning projects;
- Streamline operations and maintenance.
Solutions
- Self-financing of demolition operations through material recovery;
- Identification and quantification of the feasibility of demolition;
- Preliminary study for the review of the project proposal;
- Monitoring of the detailed study of construction phases;
- Development of quality standards;
- Securing facilities;
- Demolition of electrical systems and fluid distribution equipment;
- Sealing off utility lines and recycling removed materials;
- Work carried out using construction machinery such as excavators, including a “PMI 150” (150-metric-ton) machine, to crush and compact oversized waste.