ITER
Technical Systems Installation - Fluid Networks - Tokamak Service Installation
Location: St Paul Les Durance (13), France
Field: Process fluids, HVAC
Contract Type : Qualification and Commissioning, Construction
Key Figures
Key Figures
-
Customer Challenges
Customer Challenges
• Generate abundant, sustainable, carbon-free energy without long-lived radioactive waste
• Master fusion—the nuclear reaction that powers the Sun—is the goal of ITER
• 35 countries are involved in building the largest tokamak ever designed -
Our Solutions
Our Solutions
• Supply and Installation: Tokamak Fluid Systems (Compressed Air, Breathing Air, Demineralized Water, Drainage, etc.)
• Design, qualification, and installation of seals at system penetrations
• Provision of skilled project management resources to ensure the necessary flexibility -
Customer Benefits
Customer Benefits
• Partner with a competent general contractor who is a technical specialist in these fields
• Provide an integrated organizational structure covering all disciplines
• Flexibility and the ability to adapt to scheduling challenges -
CSR Commitment
CSR Commitment
• Compliance with health and safety regulations - Zero-Accident Goal
• Waste management - Traceability through to final disposal
Do you have a need? Let's talk about it!
Do you have a need? Let's talk about it!