EDF EPR Hinkley Point C (UK) x Ineo Nucléaire
Involvement in the construction of a new nuclear power plant – United Kingdom
Location: United Kingdom
Duration: 5 years
Year of completion: 2020
-
The Issues
The Issues
• New nuclear power plant in the United Kingdom (EPR);
• EPR reactors with a capacity of 1,638 MW each;
• Meeting 7% of the United Kingdom’s electricity demand. -
Solutions
Solutions
• Miscellaneous Electrical Installations (Small Power and Lighting): architectural and construction drawings, qualification of classified equipment, integration into the 3D model, preparation of as-built drawings, supply of electrical panels, and supervision of on-site installation (protection);
• Radiation Protection (KRT/KRC): detailed design, performance studies and specifications, supply, and on-site installation supervision.