ENEDIS x Equans
Construction, installation, and maintenance of substations
Location: France
Contract duration: 6 years
-
The Issues
The Issues
• Ensure grid availability and the quality of the power supplied;
• Ensure the flexibility and scalability of high-voltage substations. -
Solutions
Solutions
• Design and installation of 400 high-voltage substations:
220 kV / 20 kV
90 kV / 20 kV
63 kV / 20 kV
• Production (computers and control cabinets), factory acceptance testing, commissioning, installation, training, and maintenance.