2
phases of 900 MW each.
10
modified ventilation systems.
650 mètres
25 metric tons of conduits to be delivered and installed.
1,5 an
bidding process.
1,5 an
research (20 people at peak activity).
2 ans
construction sites (18 people at the peak of activity).
10 M€
Total amount: More than 10 million euros.
2
phases of 900 MW each.
10
modified ventilation systems.
650 mètres
25 metric tons of conduits to be delivered and installed.
1,5 an
bidding process.
1,5 an
research (20 people at peak activity).
2 ans
construction sites (18 people at the peak of activity).
10 M€
Total amount: More than 10 million euros.